Applying for Service in New Location
For service at a new location, your request will require construction of lines and will follow the work order process outlined below:
- A completed and signed application: Download and print here (PDF) complete, and mail, fax, or deliver to our office. All security deposits and fees along with any information listed above may also be needed before the work order can proceed.
- A meter base must be installed or the mobile home must be in place.
- A staking technician will visit your site and draw up a work order for the installation of electrical service. This work order specifies the location of the poles and lines based on the right-of-way, property lines and future plans of the member. To contact a staking technician directly, email Dwayne Douglas or Allen Green.
- A permit from the local county electrical inspector must be issed before the work order can proceed. Each county has different rules and ordinances and the member is urged to contact the inspector as soon in the process as possible.
- The member needs to locate and mark or expose personally owned underground water, sewage or gas lines. Irwin EMC will mark public utility lines such as telephone, electric, and cable lines. Irwin EMC is not responsible for damage to unmarked lines.
- The Manager of Construction Keith Barfield schedules all jobs on a first come-first serve basis according to location to maximize the efficiency of our work crews and to get your power connected just as quickly as possible. The foreman will only release the job to be built after the staking technician has completed the work order and the inspector has issued a permit.
- Once the Manager of Construction releases the job to be contructed, construction should be completed within 3 to 10 days.
To contact your Electric Inspector, call according to the county of residence:
Ben Hill County (Ken Anderson) |
(229) 426-5149 |
Berrien County |
|
Irwin County (Albert Studstill) |
(229) 468-5514 |
Tift County |
(229) 386-7961 |
Turner County (Mike Mastrario) |
(229) 567-3563 |
If you need assistance, our friendly customer service representatives are ready to help you get your electricity turned on. Call us at (229) 468-7415 or toll-free at (800) 237-3745 Monday through Friday, 8:00 a.m. through 4:30 p.m. for assistance, or bring your completed application to our office. You may also FAX your application to (229) 468-4459.